Treatment Re-Design
The main task we carry out is the comprehensive redesign of existing treatment systems for wastewater and drinking water that had malfunctions, did not comply with current regulations or had serious problems. These systems, which had been in existence for several years, were not only inefficient from a functional point of view, but also did not comply with current environmental regulations.
During the redesign processes, we focused on significantly improving the operational efficiency of the systems, while ensuring strict compliance with all applicable environmental regulations and standards. The latest technologies and innovative practices are implemented to optimize the treatment of waste and drinking water, seeking to achieve higher levels of quality of the treated water.
Additionally, special attention is paid to incorporating environmentally friendly measures throughout the design. Sustainable technologies and materials will be adopted, energy efficiency will be maximized and waste generation will be minimized. The objective is to create treatment systems that not only comply with regulations, but also contribute positively to the preservation of the environment.
Exhaustive environmental impact analyzes are carried out and strategies have been applied to minimize any negative effects on the surrounding ecosystem. Sustainability is a guiding principle at all stages of the redesign process, from technology selection to implementation of operational practices.
The redesign of these water treatment systems involved a complete transformation, addressing both functional and regulatory aspects, with a strong focus on sustainability and maximum respect for the environment.